GrantQuick

energy · DOE-NETL

Infrastructure Investment and Jobs Act (IIJA) — Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades (SPARK)

National Energy Technology Laboratory · DE-FOA-0003580

Closed

Award Range

$1$250.0M

Total Program Funding

$1900.0M

Deadline

May 20, 2026

GRANTQUICK SUMMARYPlain-English Overview

Infrastructure Investment and Jobs Act (IIJA) — Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades (SPARK). National Energy Technology Laboratory. Modification 000001: Issued to change the Informational Webinar posting date; modified NOFO Part 1, Section...

Who Should Apply

Other eligible entities

Who Should NOT Apply

Individuals and organizations outside the specified eligible types

Key Requirements (Plain English)

  • See Section II
  • Cost sharing/matching required
  • Deadline: 2026-05-20

💡 GrantQuick Tip

Budget for cost-sharing match. Demonstrate institutional commitment and matching funds clearly in your proposal.

Competitiveness: Moderate to high — federal grants are always competitive

What This Grant Funds

Modification 000001: Issued to change the Informational Webinar posting date; modified NOFO Part 1, Section II.A.2 - Participant Limitations to clarify that Tennessee Valley Authority is eligible to apply as a subrecipient under all Topic Areas; Section III.F. - Topic Area 1:Grid Resilience (IIJA Section 40101(c)) to clarify the wording around applications that are not of interest; and Section IV.C - Concept Paper to delete the sentence "Each concept paper must be limited to a single concept, technology, or project."

Please see the NOFO for a full description of the modification.


SPARK is an opportunity to meet load demand growth and resource adequacy, and to address critical national, interregional, and regional needs. OE achieves these goals by stimulating investment in power system infrastructure and building partnerships between states, local governments, tribes, and power system operators to enhance reliability and affordability of the electric grid.

 

Projects submitted under this NOFO must demonstrate measurable improvements in electric grid capacity and system value (usefulness), combining physical capacity gains, which include solutions such as reconductoring or other infrastructure upgrades with operational efficiency and/or flexibility from other Advanced Transmission Technologies (ATTs). Applications must show how these complementary technologies expand transfer capability, strengthen reliability and resource adequacy, and reduce consumer cost impact while utilizing existing rights of way. DOE will prioritize projects that can be implemented quickly to deliver durable physical upgrades and dynamic operational gains that together increase the value, performance, security, resilience, affordability, and reliability of the nation’s electric grid. 


Attachments

Who Can Apply

See Section II.A of the Notice of Funding Opportunity for a full description of the eligibility requirements.

Eligible Applicant Types

Other (see NOFO for details)

Funding Details

Minimum Award
$1
Maximum Award
$250.0M
Total Program Funding
$1900.0M
Cost Sharing Required?
Yes
Funding Instrument
cooperative_agreement

Key Dates

Posted: March 12, 2026
Application Deadline: May 20, 2026 (0 days remaining)

Agency Contact

Davina Reed

DE-FOA-0003580@netl.doe.gov

Ready to apply?

View the full NOFO and submit your application on Grants.gov