GrantQuick

science_technology_and_other_research_and_development · DOD-COE-ERDC

Improving Lake Superior outflow regulation and quantifying uncertainty

Engineer Research and Development Center · W81EWF-26-SOI-0004

Closed

Award Range

$0$200K

Total Program Funding

$400K

Expected Awards

2

Deadline

July 6, 2026

GRANTQUICK SUMMARYPlain-English Overview

Improving Lake Superior outflow regulation and quantifying uncertainty. Engineer Research and Development Center. A. The U.S. Army Corps of Engineers (USACE) invites proposals for a project to conduct a comprehensive uncertainty analysis for new outflow rating equations associated with a critical water control structure on Lake Superior. The primary focus of this... up to $200,000 per award; $400,000 total program funding; ~2 awards expected.

Who Should Apply

Other eligible entities

Who Should NOT Apply

Individuals and organizations outside the specified eligible types

Key Requirements (Plain English)

  • This opportunity is restricted to non-federal partners of the Great Lakes Northern Forest Cooperative Ecosystems Studies Unit (CESU)
  • Deadline: 2026-07-06

💡 GrantQuick Tip

Clearly demonstrate alignment with funding priorities and provide measurable outcomes.

Competitiveness: Very high — extremely limited awards available

What This Grant Funds

A.   The U.S. Army Corps of Engineers (USACE) invites proposals for a project to conduct a comprehensive uncertainty analysis for new outflow rating equations associated with a critical water control structure on Lake Superior. The primary focus of this funding opportunity is to enhance the accuracy and reliability of discharge measurements, which are fundamental to the effective management of the Great Lakes system under the Lake Superior Regulation Plan. The base task, along with both options, are all tasks that are related to improving Lake Superior outflow regulation. However, these tasks are not interdependent. The base, option 1 and option 2, are simply a priority given to these tasks if funding should be available.


Task 1:

Current operational procedures for the structure’s gates include partially open settings that are not accounted for in historical rating equations. To address this, new rating equations are currently under development by a team at the University of Michigan using advanced physical and computational fluid dynamics (CFD) modeling. A key requirement for a successful proposal under this announcement is a well-defined plan for the awardee to work collaboratively and integrate their efforts with the existing University of Michigan modeling team. This partnership will be essential to ensure the resulting uncertainty analysis is robust and directly applicable to the new ratings. The principal outcome of this work will be a quantified uncertainty band for discharge rates corresponding to various gate openings and water levels. The uncertainty analysis should use the publicly available Large Lake Statistical Water Balance Model, so the uncertainty values are consistent with already operational uncertainty models for all other components of the Great Lakes water balance. This task will require a 12 month performance period so the results can be used in an upcoming study.


Depending on availability of funding, the U.S. Army Corps of Engineers may award the following optional work:


Task 2:

The development and calibration of a high-fidelity hydrodynamic model of the St. Marys River built using the Delft3D FM suite. The scope of this model be the entire St Marys River from Point Iroquois on Lake Superior to the outlet of the River near Detour Village on Lake Huron. The domain shall include the North Channel of Lake Huron to Little Current Ontario but exclude connections to Georgian Bay. The model will be fully three-dimensional, focus on the St Marys Rapids and be able to incorporate the rating equations and uncertainty analysis proposed above.  Delft3D FM must be used as the United States Government as well as partners at Environment Climate Change Canada both have access to this modeling suite. The United States Government will provide water level and velocity data to calibrate the model as well as computational resources.


Successful projects will deliver technically sound uncertainty metrics that can be immediately integrated into USACE operational models, contributing to improved ecological outcomes and more effective water resource management. As well as the ability to provide scopes of work for the additional tasks should they be funded.

Attachments

Who Can Apply

This opportunity is restricted to non-federal partners of the Great Lakes Northern Forest Cooperative Ecosystems Studies Unit (CESU). Disclosures of current and pending support made in this application may render an applicant ineligible for funding. Prior to award and throughout the period of performance, ERDC may continue to request updated continuing and pending support information, which will be reviewed and may result in discontinuation of funding. Religious organizations are entitled to compete on equal footing with secular organizations for Federal financial assistance as described in E.O. 13798, “Promoting Free Speech and Religious Liberty.”

Eligible Applicant Types

Other (see NOFO for details)

Funding Details

Maximum Award
$200K
Total Program Funding
$400K
Expected Number of Awards
2
Cost Sharing Required?
No
Funding Instrument
cooperative_agreement

Key Dates

Posted: May 4, 2026
Application Deadline: July 6, 2026 (0 days remaining)

Agency Contact

Phoebe V Fuller Grantor Phone 6016343793

phoebe.v.fuller@usace.army.mil

Ready to apply?

View the full NOFO and submit your application on Grants.gov